Master Bath                                                            
                        Proj Total Actual Total  
                                 
    Repairs   Updates               $600 $0                                    
  1         Update Need Done   Purch   Proj Cost Actual Cost                                    
    Loosen pipe leading into wall       X X X       $200                                      
    (wont unscrew) and Replace sink trap                                                           
  2     Timo 1/26: In the video I only see the master vanity but have no idea what the shower looks like there. Can you please send a couple photos of it? You obviously need a bathroom to use so I think if we can get the front bathroom done then we can look at the master next. REPLY: The front bathroom is the one we use most. I’ve been using the back shower for food storage space because of the heat in the summer.  (I’ll clear it out and take pictures over the weekend). Also, no working sink in my Master Bath (Bucket under sink), toilet needs fixing.  So we may want to work on Master Bath first? However, no need to wait on the ceiling repair in the front bath, kitchen and mold in closet. Then we can remodel the whole front Bathroom - once master bath is done, if that works for you. I work with plumbers and estimate only 2 or 3 days per bath. So we should be able get both bathrooms done over the next few weeks.             Purch   Proj Cost Actual Cost                                    
    Replace bathroom sink, cabinet and countertop             X   $400                                      
     ($200) + Install and plumbing                                                        
  3 Bathroom remodel (Waiting Estimate)             Purch   Proj Cost Actual Cost                                    
                                                             
                                                             
  4               Purch   Proj Cost Actual Cost                                    
                                                             
                                                             
  5               Purch   Proj Cost Actual Cost                                    
                                                             
                                                             
  6               Purch   Proj Cost Actual Cost                                    
                                                             
                                                             
  7               Purch   Proj Cost Actual Cost                                    
                                                                 
                                                                 
  8               Purch   Proj Cost Actual Cost  
                                 
                                                             
                                                             
  9     Timo 1/28: I'm good with doing the master bath first since you dont use it as much. Doesn't look so bad but I'm going to just redo it also. New tile shower + fixture, vanity, toilet, floor. Whole thing done essentially.           Purch   Proj Cost Actual Cost                                    
                                                             
                                                             
  10               Purch   Proj Cost Actual Cost                                    
                                                             
                                                             
  11                 Purch   Proj Cost Actual Cost                                    
                                                               
                                                               
  12                 Purch   Proj Cost Actual Cost